Purpose
To define a standardized process for reviewing and approving system architecture designs, ensuring they meet business requirements, technical quality, and compliance standards before implementation begins.
Scope
- Applies to all new projects, major feature builds, and infra changes.
- Used by Developers, Tech Leads, Architects, DevOps, and QA leads.
- Covers system architecture blueprints, infra diagrams, API contracts, and DB schema designs.
Objectives
- Guarantee that architectures are scalable, secure, and cost-efficient.
- Ensure designs align with company-wide standards (patterns, versioning, modularity).
- Create a transparent approval workflow that avoids delays but enforces rigor.
Step-by-Step Process
Step 1 – Preparation (By Developer/Architect)
- Draft the System Architecture Blueprint (Doc 1).
- Create the Infrastructure Diagram (Doc 2).
- Prepare supporting docs:
- API Contract (Doc 4).
- Database Schema (Doc 5).
- Error Handling Strategy (Doc 6).
- Logging & Observability Plan (Doc 10).
- Log initial proposal in Architecture Decision Log (Doc 12).
Step 2 – Internal Peer Review
- Share draft in Architecture Review channel (Slack/Teams).
- Assign at least 2 peer reviewers (senior devs or leads).
- Collect feedback on:
- Scalability.
- Security.
- Performance.
- Maintainability.
- Cost implications.
- Update proposal before formal review.
Step 3 – Formal Review Session
- Schedule a review meeting (within 5 working days of submission).
- Attendees: Project Lead, Architect, DevOps, QA Lead, Security Rep (if required).
- Presenter walks through:
- Business requirement → design rationale.
- Architecture diagrams + modules.
- Data flows + integration points.
- Risks & constraints.
- Reviewers challenge assumptions, raise risks, and request changes.
Step 4 – Approval or Revision
- Outcomes:
- Approved: Architecture locked for implementation.
- Approved with Changes: Minor adjustments required, no re-review.
- Rejected: Major gaps → revise and resubmit.
- Decision logged in ADR (Doc 12) with date & rationale.
Step 5 – Post-Approval Communication
- Update Project Documentation Hub (Confluence/Notion).
- Share approved blueprint & diagrams with all developers.
- Mark relevant tickets as “Ready for Dev” in PM tool.
- Archive all feedback for future audits.
Roles & Responsibilities
| Role | Responsibility |
| Developer/Architect | Drafts blueprint + supporting docs |
| Peer Reviewers | Provide feedback during informal review |
| Project Lead | Chairs formal review, ensures timeline |
| DevOps Engineer | Validates infra feasibility + costs |
| QA Lead | Validates testability & quality criteria |
| Security Rep | Ensures compliance with security standards |
| Documentation Owner | Uploads & maintains approved artifacts |
Governance
- Review SLA: Every architecture must be reviewed within 5 working days.
- Quorum: Minimum 3 reviewers (Lead + DevOps + QA) must sign-off.
- Change Control: Any architecture changes post-approval require a new ADR entry and mini-review.
- Audit Trail: All approved docs stored in central repository with versioning.