Checklist: Wireframe Review

Purpose

To validate the quality, structure, and completeness of wireframes before they are finalized. Prevents missed states, inconsistent spacing, or unclear flows.


Wireframe Review Checklist

ItemCheckStatus (☑/✗)Notes
Structure & LayoutScreen follows Wireframe Structuring Model (Hero, CTA, Info, Action, Feedback)  
Grid AlignmentElements respect Grid & Spacing Rulesheet  
ConsistencyReusable blocks/cards match across screens  
State VariantsEmpty, Loading, Success, Error, Permission states are included  
AnnotationsNotes for interactions, transitions, and edge cases documented  
ClarityNo ambiguous labels (“Something here”) or lorem ipsum  
NavigationEntry & exit points align with UX Flow Diagram  
AccessibilityMinimum tap/click sizes and text sizes respected  
ResponsivenessDesktop + mobile variants drafted; tablet considered  
Business AlignmentWireframe supports defined goals/success criteria  
Review CyclePeer feedback incorporated  
Final ApprovalDesign Lead reviewed & approved  

Usage Notes

  • This checklist must be completed before wireframes are marked “Approved.”
  • Designer → self-check → peer-review → lead approval.
  • Store the completed checklist alongside the wireframe set in the project folder.